Oxidized Bitumen 105-15:

Oxidized Bitumen 105-15 created by further vigorous air process another names of it is blown asphalt 105/15, oxidized bitumen 105/15, hard bitumen.
It also is Semi Solid grade of pure petroleum bitumen made by air-blowing through an asphalt flux. Because of physical specs it uses in construction.
Passing air through bitumen at elevated temperature can used to alter its physical properties.
Degree of oxidation ranges from very small, or semi-blowing, through to “full” blowing. Bitumen specs are significantly different to penetration grade bitumen.
Nomenclature and grading for the oxidized bitumen products is based on a combination of temperature. At which bitumen reaches a certain “softness” when being heated up as expressed by ring and ball softening point test, and the penetration value
As said before, Oxidized asphalt 105/15 is based on petroleum bitumen which is made by blowing bitumen 60/70 by very hot air.
In addition the numbers relate to the midpoint of material’s softening point and penetration respectively.
The softening point value measured by Ring and Ball method as determined by ASTM D 36.
Also penetration value is in 1/10 mm as determined by IP 49 or ASTM- D5.
Also currently Oxidized Bitumen oil refining method, breaking residue production is the use of 2 different sets of process equipment will produce qualified products according to different market and season demand. Probably, this production isn’t only huge investment, however conjointly waste a lot of high quality heat.


Application of Oxidized asphalt 105/15:

Oxidized asphalt 105/15 uses in the chemical, fuel, paints, lacquers, varnishes, paper-pulp-board, textile processing, road construction, pavement ,crack seal and repairmen, civil works, roofing, construction industries; sealing and insulating buildings, adhesive, construction materials additive, dust-binding, coating, insulating and impregnating agent, make rubber and plastic products. The blown asphalt 105/15 products are for paving, roofing; also used in asphalt based paints for corrosion protection of metals, in lining public works structures, adhesives in electrical laminates, base for synthetic turf; typical uses for oxidized asphalt 105/15 include roofing, pipe coating, Portland cement pavement, hydraulic applications, paint manufacturing.


Technical Advantages of Blown Bitumen 105/15:
  • Durability
  • Flexibility
  • Water Resistant
  • Chemical Stability


Storage and Handling:

Heating of packaged bitumen is a critical phase in most of the final uses. Typically, the packaged material is heated and melted in boilers out on site.
However, control at the heating phase is very important in terms of health and safety as well as in maintaining the quality of the product.

Note must be taken of the maximum safe handling temperature of 230 C and this should not be abused. Bitumen is a poor conductor of heat, consequently, control of the heating phase is of paramount importance.

The Blown Bitumen material should be broken up prior to placement in the boiler. This exposes a larger surface area to the heat and encourages a more even heating regime. Without the larger exposed surface area, aggressive heating at the base and sides of the boiler may well result in localized overheating, altering the characteristics of the Chemical Mine World modified bitumen and potentially causing thermal cracking of the bitumen, creating the release of low lash vapors.
The flash point of the oxidized bitumen then becomes irrelevant; as these low flash vapors determine the fire risk.
Melted bitumen should not be left in the boiler and reheated from cold, as there is then a high potential for localized overheating around the heating area (lack of convection means poor heat transfer) and potential development of a pressurized pocket of low flash vapors.
Be aware of the placement of any temperature monitoring or control devices. As a result of the poor thermal conductivity of the bitumen, a thermometer in the bitumen some distance from the heat source could read significantly different (even hundreds of degrees) from the true temperature of the bitumen near the heat source.
For Health and Safety information, please make reference to the relevant MSDS.


Health & Safety:

Workers should wear protective masks, gloves, and goggles during application. The asphalt can be removed from equipment and tools with kerosene or gasoline. Care should be taken when heating Blown Bitumen 105/15 to avoid over heating


Datasheet of Oxidized Asphalt 105/15:

Bitumen 105/15 Test method Unit Specification
Specific gravity @25/25 C ASTM D70 (Kg/m3) 1.05 approx.
Penetration @ 25°c ASTM D5 mm/10 10-20
Softening point °c ASTM D36 °C 100/110
Loss on heating(wt) % ASTM D6 Wt. % 0.2 max
Flash point c ASTM D92 °C 250 min
Solubility is CS2(wt) % ASTM D4 Wt. % 99.5 max
Spot test A.A.S.H.O.T102 Negative